SOLUTION — DATA CENTER POWER

Data Center Power Infrastructure — Delivered When Others Can't

Global lead times for switchgear and transformers now stretch 2–4 years. Kexingyu Power manufactures MV switchgear, prefabricated substations and data-center-grade cable with significantly shorter delivery cycles.

Global data center power demand is projected to nearly double by 2030. At the same time, up to 30–50% of planned U.S. data center capacity may face delays in 2026 due to switchgear and transformer shortages — not a lack of funding, land or chips. Kexingyu Power provides an alternative manufacturing route with shorter, more predictable delivery.

(Industry estimates as of early 2026)

Equipment Package

Coiled low voltage power cable with black PVC jacket, red and black insulated cores, and exposed stranded copper conductors on white background

Switchgear & Distribution

MV Switchgear

Coiled medium voltage XLPE power cable with thick black outer jacket and exposed stranded copper conductor on white background

Transformers & Substations

Dry-Type Transformer

Bundle of thin multi-core control cables with black outer jackets, color-coded insulated cores and exposed copper conductors on white background

Switchgear & Distribution

LV Distribution Panel

Coiled shielded instrumentation cable with black outer jacket, visible braided metal shielding and color-coded insulated conductors on white background

UPS & Critical Power

UPS + ATS/STS

Coiled orange fire-resistant LSZH cable with exposed copper conductors and color-coded insulated cores on white background

UPS & Critical Power

PDU / Busway

Coiled black solar PV cable with weather-resistant insulation and photovoltaic connector on white background

Cables & Wiring Systems

LSZH Power Cable

Faster Delivery

In-house production, not queued behind global backlogs

Full Certification

IEC/CE/ISO 9001 with downloadable test reports

One Coordinated Package

Six product lines from one supplier, one delivery schedule

End-to-End Execution

From Project Review to Global Delivery

A controlled project workflow covering engineering review, manufacturing, factory acceptance testing and export delivery.

  1. Project Submission

    Requirements, specifications and project documentation are submitted.

  2. Technical Review

    Our engineering team reviews compliance, design and system requirements.

  3. Manufacturing & FAT

    Production, quality inspection and factory acceptance testing.

  4. Export Delivery

    Export packaging, documentation, logistics and project handover.

WHY Kexingyu?

Global lead times for cables are relatively stable — but sourcing them alongside switchgear, transformers and inverters from one factory means fewer vendors, fewer delays, one point of contact.