SOLUTION — DATA CENTER POWER
Data Center Power Infrastructure — Delivered When Others Can't
Global lead times for switchgear and transformers now stretch 2–4 years. Kexingyu Power manufactures MV switchgear, prefabricated substations and data-center-grade cable with significantly shorter delivery cycles.
Global data center power demand is projected to nearly double by 2030. At the same time, up to 30–50% of planned U.S. data center capacity may face delays in 2026 due to switchgear and transformer shortages — not a lack of funding, land or chips. Kexingyu Power provides an alternative manufacturing route with shorter, more predictable delivery.
(Industry estimates as of early 2026)
Equipment Package

Switchgear & Distribution
MV Switchgear

Transformers & Substations
Dry-Type Transformer

Switchgear & Distribution
LV Distribution Panel

UPS & Critical Power
UPS + ATS/STS

UPS & Critical Power
PDU / Busway

Cables & Wiring Systems
LSZH Power Cable
Faster Delivery
In-house production, not queued behind global backlogs
Full Certification
IEC/CE/ISO 9001 with downloadable test reports
One Coordinated Package
Six product lines from one supplier, one delivery schedule
From Project Review to Global Delivery
A controlled project workflow covering engineering review, manufacturing, factory acceptance testing and export delivery.
-
01
Project Submission
Requirements, specifications and project documentation are submitted.
-
02
Technical Review
Our engineering team reviews compliance, design and system requirements.
-
03
Manufacturing & FAT
Production, quality inspection and factory acceptance testing.
-
04
Export Delivery
Export packaging, documentation, logistics and project handover.
WHY Kexingyu?
Global lead times for cables are relatively stable — but sourcing them alongside switchgear, transformers and inverters from one factory means fewer vendors, fewer delays, one point of contact.